The project involves riverbed sand mining from the Mula River at Ghargaon to meet the demand for building-grade sand in Sangamner and adjoining areas. The proposed sand ghat covers 1.13 hectares with a permitted/proposed production capacity of 1,988 Brass. Mining is proposed through open-cast manual mining. The project is expected to support construction and infrastructure requirements, generate direct and indirect employment for local people, improve local infrastructure, and contribute revenue to the district and state.
Project Cost: Overall project cost: Not specifically stated in the document. The document provides an EMP capital cost of ?1,04,140 and recurring cost of ?72,493 per year.