Subscription

Private SectorProject Information Proposal For Chhadgada Pumped Storage Hydropower Project, Prayagraj–Mirzapur, Uttar Pradesh, India – 900 Mw Capacity INR 3580 Cr INR 35.80 Bn
23-Jun-2026
PID : 69174 Uttar Pradesh-India

Project detail:
The project proposes the development of the Chhadgada Pumped Storage Project (PSP) with an installed capacity of 900 MW, configured as a closed-loop pumped storage hydropower scheme comprising 2 × 300 MW and 2 × 150 MW units. The project includes construction of upper and lower reservoirs, dams, intake structures, water conductor systems, powerhouse complex, and associated transmission infrastructure. The project is intended to support integration of renewable energy into the grid, provide peak power supply, load shifting, frequency regulation, grid stability, and energy storage services. The project is expected to contribute significantly to India's clean energy transition, reduce carbon emissions, strengthen energy security, and support economic development through infrastructure investment and employment generation.

Project Cost:  3580.37 Crore

Note: please download project document attached to this project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top