|
Project detail:
The project is for Mining of Stone (Minor Mineral) from Acres 7.20Acre (2.913Ha).Mining Lease area (B2 Category Project). The project envisages of 403104 Cum And 1128691 Tons of stone production from Bekchuri Stone Mine during 5 years of Plan period. Maximum production per year from the Mine will be 89538Cum (Max.) 250705 Tonnes( Max.).
The Letter of Intent (LoI)/Lease Grant has been issued by District Mining Office, Sahibganj, Jharkhand in favor of Bekchuri Stone Deposit, vide letter no vide 1368/M dated 12-12-2024 for carrying out Stone Mining operation. In principal approval for 7.20Acre (2.913Ha. has been granted under the Jharkhand Minor Mineral Concession Rules, 2014 Rule 11 (1). Mining operation on shall be carried out after obtaining statutory permissions.
Project Cost: 101.65 Lakh
Note: please download project document attached to this project for more information.
|