This Pre-Feasibility Report (PFR) has been prepared as per the guidelines specified in MoEF&CC’s OM no. J–11013/41/2006–IA. II (I) dated 30th Dec., 2010; as part of the application for obtaining Environmental Clearance of Tetaria Stone Deposit. The project envisages of 3,47,475 Cum. / 10,42,421 Tons of stone production from Tetaria Stone Deposit during the planned period. Maximum production per year from the Mine will be 69,578 Cum. (Max.) / 2,08,735 Tons per year (max.).
Project Cost: 120.45 Lakh