Project detail:
The environmental management plan consists of the set of mitigation, management, monitoring and institutional measures to be taken during the implementation and operation of the project, to eliminate adverse environmental impacts or reduce them to acceptable levels. Environment management plan details the quality control measures which are proposed for this project to achieve the production about 43387.93 cum/annum or 125825 TPA of Stone.
The Environmental Management Plan (EMP) has been formulated and integrated with the mine planning to mitigate the adverse impacts which are likely to be caused due to the mining operation and for overall scientific development of local habitat. The EMP has, therefore, been developed considering its implementation and monitoring of environmental protection measures during mining operations.
Note: please download project document attached to this project for more information.
|