Project detail:
The proposal is for production of boulder stone from Borna Stone Deposit. The maximum annual production from the Mine shall be 18,000 tons and 90,213 Tons in the planed period. Mining lease area is 2.00 Acres (0.81 Ha). The production is by drilling and blasting using slurry explosive. Blasted material will be broken by rock breaker. Material shall be transported by tractor trolleys/tipper. The project for Mining and falls under activity 1(a) as per EIA Notification, 2006, under B2 Category.
Project Cost : 72.38
Note: please download project document attached to this project for more information.
|