Project detail:
Area under consideration is fully exposed with horizontally Laterite start and overburden up to 1.0 M depth. It is {govt. Revenue land mining activity has to be done following all the security mechanized methods by using Rock Breaker. Total available mineable reserve 6,23,985.6 ton Laterite, (Max) Ton & Laterite: 49,392 Ton, production annually. As per MOEF notification no. om no. j – 1312 /12/2013 - IA –II (i) dated 24th December 2013. The project comes under B2 category. Hence pre – feasibility report has been prepared for a final decision by competent authority to issue environmental clearance to the proposed project. laterite is a highly weathered material rich in secondary oxides of iron, aluminum or both. Laterite is used as an additive in cement industry. Laterite soil can be used as a building material for the manufacturing of bricks.
Project Cost: 40 Lakh