Project Detail:
As per EIA Notification September 2006 and its amendment their after the project is classified as schedule 1(a), Category B Project. The mine is over an area of 01.14.04hect. The production is 84,000 MTPA & this is an independent mining project and there are no interlinked projects involved.
The sand mining will be carried out mainly by Semi-Mechanized Method with the use of mining equipment’s. The mined-out sand will be transported through trucks, tippers etc. to the end users.
The main operation shall be digging, shorting and the transportation by trucks. The Mineral trucks are to be loaded by excavator.
Total Project Cost: Cr. 1,51,22,750
Note: Please Download Project Document attached to this Project for more information.
|