Project Detail:
Assignment limits to SPMG West Bengal are allocated by the National Mission for Clean Ganga from time to time in accordance with the Model 1A of the Treasury Single Account (TSA) system (Hybrid TSA) as specified in Department of Expenditure (DoE) OM No. 3/(06)/PFMS/2023 dated 21 May 2024.
There will be no physical release of funds by the SPMG West Bengal to the executing agencies at third level and below. Executing Agencies at the third level and below are also required to be on-boarded on the Hybrid TSA. Only limits will be assigned to the agencies at third level as per the procedure stipulated in the aforesaid DOE OM.
Total Project Cost: Cr.7.11
Note: Please Download Project Document attached to this Project for more information.
|