Project Detail:
As the project location is blessed with fairly good rainfall, it is planned to collect the storm water at different gradients of the location. There will be rainfall runoff from building roof-tops, roads & pavements & greenbelt area. Necessary provision will be made to collect the quantity of rainfall runoff during the most rainy day of season. Necessary rain harvesting pit / recharge pit at every 20m centre to centre have been envisaged. A garland drain with 600mm wide with RCC precast perforated cover and 1000 mm Dia RCC precast Ring soak pit will be provided around the periphery of property & designed as per building by-law (schedule 12).
Total Project Cost: 80 Cr.