Subscription

Private SectorProject Information Proposed Expansion in Capacity of the Existing Barite Dry Beneficiation Plant (throughput) from 20,000 TPA to 1,80,000TPA and Modification with the Addition of Wet Beneficiation Unit of the Capacity of throughput 1,24,000TPA). INR 36 Cr INR 360 Mn
18-Dec-2024
PID : 66293 Andhra Pradesh-India

Project Detail:

The raw material is fed into the separator to improve the specific gravity from low grade to high grade. The Separator system was inbuilt with dust collecting system and the process of separation will take place in closed circuit with pipe duct system without any scope of emanation. The Separator of electro  static diode belt dry process system, free from noise, dust, Chemicals, Water, Toxic Efficient etc. This Separator is purely Dry process system. In the C Grade the silica elements are about 12% to 14% and Alumina as 2% to 3% along wit small percentage of sediments. The Separator separates the Silica, Alumina, sediments and other low-densit minerals from barite powder ground from grinding mills and passing the same through separator.

Total Project Cost: 36 cro
Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top