Project Detail:
Type of project including interlinked and interdependent projects: The mining of Marble, Low-grade Lime & Subgrade is carried out by open-cast Semi- mechanized method. This is an independent project and is not proposed to be linked to any other project.
However, since the increase in its current production has been proposed and the cluster area of mines within the immediate surroundings is more than 5 hectares, it is categorized under B2 but at par with category B1, an EIA is required to be prepared for obtaining the EC.
Total Project Cost: 150 Lakh
Note: Please Download Project Document attached to this Project for more information.
|