Project Detail:
Boulder Stone in the Mine area is proposed to be excavated by conventional method of opencast mining through the formation of safe benches. It will be serli-mechanized and on single shift basis Working benches will be fonned and lvorked in a top to dor,vnward manner. Because of presence of hard rock mass, regular drilling and blasting '"vill be perforrned for loosening of the rock l-nass. The blasted rock will be rnostly excavated and broken by excavators with rock breakers.
Total Project Cost: 125000
Note: Please Download Project Document attached to this Project for more information.
|