Project Detail:
The topography of the lease area and its surrounding is hilly terrain with highest elevation of the lease area 180m above MSL and lowest is 110m above MSL. The drainage of the lease area was towards South East side. No habitants are located in the lease area. Normally, the mine area is closed during rains, in case of necessity accumulated rainy water (free from suspended solid material) from pit bottom may be pumped out & may spilled over adjoining areas, which may be used by native plants (coconut) and the same were used for watering saplings/trees in the plantation side.
Total Project Cost: Cr.2.1780000
Note: Please Download Project Document attached to this Project for more information.
|