Project Detail:
Type of project including interlinked and interdependent projects: No Interlinked or Interdependent project.
Product from this mine will be used in road, rail or building construction project.
Details of Alternate Site Considered and the Basis of Selecting the Proposed Site, Particularly the Environmental Considerations Gone Into Should Be Highlighted:
Mining is site specific project hence no alternate site is considered.
Size/Magnitude of Operation:
The proposed production of Soil is 2,000 Cu.mt/year from the area of 1.000 Hect. Areas by open cast Manual method of mining. T average number of working days in the year would be about 300.
Total Project Cost: 15 Lakh