Project Detail:
Type of project including interlinked and interdependent projects, if any There is no interlinked & interdependent project. The project is site specific. The entire Rough stone are transported to the nearby crushing unit to reduce into desirable size for construction of Road projects and other infrastructure development project work.
(ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates
? The area is mentioned in GSI Topo sheet No. 58 E/13
? The Latitude between of 11°48'17.3755”N to 11°48'25.8984”N
? The Longitude between of 77°46'05.7517''E to 77°46'11.6794”E on WGS 1984datum.
Total Project Cost: 44,38,399
Note: Please Download Project Document attached to this Project for more information.
|