Project Detail:
Mining is to be carried out by Semi mechanized open- cast method without drilling & blasting. The benches shall be taken 2.0 m height & the width of the road shall be more than height of bench. Haul road & Bench ramp shall be made of 1 in 16 gradient. The loading shall be done by excavator in the Tippers. This will help in better utilization of the resources and systematic development of the mine. The mineral is soft in nature & directly dig gable so no drilling & blasting is required.
Note: Please Download Project Document attached to this Project for more information.
|