Project Detail:
Type of the Project Including Interlinked and Interdependent Project.
Sand in the bed lease area is proposed to be mined out by conventional method of opencast mining through manual operation. As this is sand mining, benches will not be required and the maximum depth of mining will be of 1m. Because of presence of soft and incompetent sand mass, drilling and blasting are not required.
Total Project Cost: 2 Lakh
Note: Please Download Project Document attached to this Project for more information.
|