Project Detail:
The proposal was considered by the sectoral Expert Appraisal Committee (EAC) in its 50" EAC Meeting on 27" September, 2023 through video Conferencing. The details of the proposal, as ascertained from the proposal documents and as revealed from the discussions held during the meetings.
The project area is covered under Survey of India Topo Sheet No F45T1 on R.F 1:50000 and special toposheet nos. D1, D2, E1& E2 on R.F 1:10000. and is bounded by the geographical coordinates ranging from latitude 20°57'58.03"N to 20°59'17.44"N and longitudes 85° 826.86"E to 85° 11'5.73"E.
Coal linkage of the project: Power Plants and basket linkage.
Joint venture cartel has been formed: Not Applicable.
Project does not fall in the Critically Polluted Area (CPA), where the MoEF & CC vide its OM dated 13th January, 2010 has imposed moratorium on grant of environment clearance.
Employment generation: Approximately 1007 nos. of direct employment already generated.
The project is reported to be beneficial in terms of: Improvement in Physical Infrastructure, Improvement in Social Infrastructure, Increase in employment potential, Contribution to the Exchequer (both State and Central Govt.), Post mining enhancement of Green Cover, Improvement of Electrical Power Generation & availability of electricity for 24x7 in rural areas and Overall economic growth of the country.
Total Project Cost: Cr. 490.10
Note: Please Download Project Document attached to this Project for more information.
|