Project Detail:
It is proposed take up the project in phased manner, in the 1st phase it is proposed to install 37.5 KLD distillery unit and 1.25 MW captive power plant and in second phase it will be enhanced to 75 KLPD and 2.5 MW respectively. Details of raw materials used, water requirement, wastewater management, Solid and Hazardous waste management, and all other details are presented for full scale operation of the plant i.e.,75 KLD Distillery and 2.5 MW captive power plant. The total land area of the project site is 4.046 Ha and the estimated capital cost of project is ? 117.8 Crores.
Cost of the project ? 117.8 Crores