Project Detail:
Public Hearing for the proposed project was conducted by the Maharashtra Pollution Control Board on 06.03.2023 at M/s. Panchaganga Sugar and Power Private Limited, which was presided by Additional District Collector. The main issues raised during the public hearing and their action plan is annexed as Annexure –III.
Total land area required is 24.39 hectares. Greenbelt will be developed on total area of 8.1 hectares i.e., 33% of total project area. The estimated project cost is Rs. 578.99 Crores. Capital cost of EMP would be Rs. 78.66 Crores and recurring cost for EMP would be Rs. 2.14Crores per annum. Industry proposes to allocate Rs. 7.51Crores towards Extended EMP (Corporate Environment Responsibility). Total Employment will be 700 (150- 200 during Construction and 400-500 during operation phase) persons as direct & indirect.
Estimated project cost is Rs. 578.99 Crores.