Project Detail:
Existing industry is operational on the basis of Consent to operate because Sugar unit is 3500 TCD and Cogeneration 14 MW. Thus, Environmental Clearance was not applicable. Latest CTO (air and water) was issued on 13/02/2023 and is valid till 30/06/2027. Certified CTO compliance report dated 21st Jan 2023 issued by Senior environmental officer, KSPCB. Regarding issues of CFO condition w.r.t. implementation of water harvesting system, PP informed that rain water harvesting system and storm water management system will be implemented in the expansion of the project and same will be implemented in this FY of 2023-24. Regarding, display of flow diagram of the pollution control system near to pollution control device, PP informed that Flow diagram of ETP, display board has been placed near ETP area & air pollution control, board and submitted photographs. Regarding irrigation management plan for treated effluent, PP informed that Plan has been prepared and submitted to SPCB. However, proposed sugar expansion sugar unit will be based on ZLD, all ETP treated water will be recycled to meet the requirement of fresh water demand in Distillery unit. The Committee was satisfie with response of PP.
Total existing plant area is 71 Ha, which is under possession of the company and converted to industrial use and no additional land will be acquired for the expansion project as the same will be done within existing plant premises. Out of the total plant area 71 Hectares, area earmarked for greenbelt is 23.4 ha i.e. 33% of the total plant area. Out of which, existing 8.2 ha has already been developed as greenbelt and now remaining area i.e. proposed 15.2 ha will be developed as greenbelt & plantation in and around plant premises. The estimated project cost is Rs. 338.84 Crores. Further, PP has submitted revised Capital cost of EMP as Rs. 34.95 Crores and recurring cost for EMP would be Rs. 3.08 Crores per annum. Industry proposes to allocate Rs. 3.83 Crores towards extended EMP (Corporate Environment Responsibility). Total Employment after expansion will be 270 persons as direct & indirect.
The estimated project cost is Rs. 338.84 Crores.
Note: Please Download Project Document attached to this Project for more information.
|