Project detail:
Establishment of Sponge Iron unit (2,25,000 TPA), Induction Furnace with matching LRF & CCM (Billets / Ingots / Hot Billets) (2,40,000 TPA), Rolling Mill (TMT Bars / Structural Steel) (2,25,000 TPA), Brick manufacturing unit – 25,000 bricks/day, WHRB based Power Plant – 18 MW (3 x 6 MW), AFBC based Power Plant - 6 MW Village: Chicholi, Tehsil: Kharora, District: Raipur, Chhattisgarh
Total project land is 12.19 Ha (Private Land:11.346 ha and Govt. Land: 0.843 Ha). Entire Private land has been registered in the company name and entire land has been diverted for industrial purpose. Lease application for 0.843 ha of Govt. land for a 99 years period is under progress.
The nearest human settlement from the project site is Gaurkhera at a distance of 0.85 km in the North direction.
Jamuniya Nala (1.2 Km, W), Mahanadi Branch canal (4.8 Km, SW), Kirna Tank (7.7 Km, W), Pindraon Pond (4.8 Km, S) and Kumhari Pond (2.8 Km, NE) exists within the study area of 10 km from the project site. The EAC is of the opinion that water bodies shall not be disturbed. Mitigation measures w.r.t. safeguarding the water bodies shall be implemented.
The capital cost of the proposed project is Rs. 435 Crores
Note: please download project document attached to this project for more information.
|