State GovernmentProject Information Metro Corridor from Bahadurgarh to Sampla (Haryana). Refer Document
29-Nov-2022
PID : 58078 Haryana-India

Project detail:

The present study focuses on carrying out a realistic assessment of traffic on the proposed metro corridor from between Bahadurgarh and Sampla. The detailed scope of this study from an extensive perspective has been elaborated below.
i. The study will assess the following:
• Baseline total and assigned traffic onto the system across horizon years
• Metro ridership and passenger km across horizon years
• PHPDT (peak sectional load) across horizon years
• Corridor wise ridership across horizon years
• Different station loadings (boarding, alighting numbers) across horizon years
• Unidirectional station boarding and alighting in the peak hour giving sectional load in peak hour
• Base network, traffic and travel characteristics amidst a multi model setup and
• The dynamics of traffic shift to the proposed system in wake of competing modes across horizon years.

Note: Please download project documents attached to this project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top