The present study focuses on carrying out a realistic assessment of traffic on the proposed metro corridor from between Bahadurgarh and Sampla. The detailed scope of this study from an extensive perspective has been elaborated below.
i. The study will assess the following:
• Baseline total and assigned traffic onto the system across horizon years
• Metro ridership and passenger km across horizon years
• PHPDT (peak sectional load) across horizon years
• Corridor wise ridership across horizon years
• Different station loadings (boarding, alighting numbers) across horizon years
• Unidirectional station boarding and alighting in the peak hour giving sectional load in peak hour
• Base network, traffic and travel characteristics amidst a multi model setup and
• The dynamics of traffic shift to the proposed system in wake of competing modes across horizon years.