Non classifiedProject Information
Parbati Hydroelectric Project (Stage-II).
|
INR 3919.59 Cr
INR 39.19 Bn
|
20-Oct-2022
|
PID : 57995
Himachal Pradesh-India
|
Project Detail:
Parbati Hydroelectric Project (Stage-II) is a run-of-the-river scheme proposed to harness hydro potential of the lower reaches of the river Parbati. The river is proposed to be diverted with a Concrete Gravity Dam at Village Pulga in Parbati valley through 31.52 Km long Head Race Tunnel and the Power House shall be located at village Suind in Sainj valley. Thus gross head of 863 m between Pulga and Suind will be utilized for generating 800MW power. The diverted discharge of the river Parbati has been further augmented by diverting the discharge of various nallahs falling along the HRT alignment.
Project Cost: Rs. 3919.59 Crores (December 2001 price level)
Note: Please Download Project Document attached to this Project for more information.
|
|
Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.