Subscription

Corporations/ Associations/ OthersProject Information Shongtong-Karcham Hydroelectric project (402MW). Refer Document
20-Sep-2022
PID : 56945 Himachal Pradesh-India

Project Detail:

The Shongtong-Karcham Hydro Electric Project has been envisaged with the purpose of exploiting the potential in the Satluj River between villages Powari and Ralli. The project envisages the construction of:
- Diversion barrage, intake structure with 4 intake bays with gates and four intake tunnels passing through four sedimentation chambers.
- Head Race Tunnel 8.02 km long culminating in open surface surge shaft.
- Three circular steel lined underground pressure shafts to convey water to 3 Fransis turbines to generate (3 x 134 MW) 402 MW of power in a underground power house.
- Tail Race Tunnel of 10.0 m dia and 90 m length to discharge flow into river Satluj near village Ralli.

Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top