Corporations/ Associations/ OthersProject Information
Shongtong-Karcham Hydroelectric project (402MW).
|
Refer Document
|
20-Sep-2022
|
PID : 56945
Himachal Pradesh-India
|
Project Detail:
The Shongtong-Karcham Hydro Electric Project has been envisaged with the purpose of exploiting the potential in the Satluj River between villages Powari and Ralli. The project envisages the construction of:
- Diversion barrage, intake structure with 4 intake bays with gates and four intake tunnels passing through four sedimentation chambers.
- Head Race Tunnel 8.02 km long culminating in open surface surge shaft.
- Three circular steel lined underground pressure shafts to convey water to 3 Fransis turbines to generate (3 x 134 MW) 402 MW of power in a underground power house.
- Tail Race Tunnel of 10.0 m dia and 90 m length to discharge flow into river Satluj near village Ralli.
Note: Please Download Project Document attached to this Project for more information.
|
|
Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.