Project Detail:
The proposed project is for manufacturing of existing Printing Ink - 35,000 MTPA with the addition of Intermediate manufacturing of PU Resin of 3500MTPA by backward integration.
The total land area acquired by unit is 74,575.38Sq.m. The cost of the existing project is 21461.89 Lacs & the estimated cost of the installation of PU resin process will be 158.49 Lacs. The total cost of project is 21620.38 Lacs.
Note: Please Download Project Document attached to this Project for more information.
|