Proposed production from the mine is 12 MTPA. The total cost of the project is estimated about Rs. 5,546 Crores. Mining is proposed to be carried out by opencast method.
Combination of shovel-dumper and surface miner are proposed for coal extraction whereas OB removal by shovel-dumper. Drilling & blasting is proposed for extraction of coal, removal of OB and interburden.
Crushing is proposed for reduction of coal from ROM to (-100) mm size. Coal evacuation within the mine will be done by 60 T coal body dumpers. Coal from the CHP will be transported through a surface conveyor to the silos/load out point located at southern boundary of the block, loading into railway wagon through rapid loading system and to be dispatched through the railways. The coal has to be transported from Banhardih to Patratu STPP by rail, which is at distance of approximate 95 km by rail.