Project Detail:
Suvakheda, & Kheda Rathore Limestone Mine (Area: 221.043 hectare) is a proposed opencast mining project located near village- Suvakheda and Kheda Rathore, TehsilJawad, District- Neemuch, Madhya Pradesh.
This is a mining project for mineral limestone with maximum excavation of ROM 5,00,010 TPA. To upgrade the final output from the mine it is proposed to carry out primary crushing within leasehold area. The proposed capacity of the crusher plant is 225-250 TPH. The total mineable reserves are 23.84 million tonnes; at the present planned rate of production the life of mine works out to be 48 years. Mine life is based on present probable reserves and it may change after detailed exploration of the area.
The estimated project cost will be 414.00 Lac
Note: Please Download Project Document attached to this Project for more information.
|