State GovernmentProject Information Kurukutti Pumped Storage Project (1200 MW). INR 4766 Cr INR 47.66 Bn
26-Oct-2021
PID : 51190 Andhra Pradesh-India

Project Detail:

Kurukutti PSP is a standalone pumped storage scheme envisaged with an installed capacity of 1200 MW (8400 MWH storage capacity), located in the Salur Taluka of Vizianagaram District, Andhra Pradesh. The scheme envisages recycling of stored water between upper reservoir and lower reservoir (common for both Kurukutti and Karrivalasa
PSPs) located across Boduru Gedda river, a tributary of Suvarnamukhi river in Nagavali river basin. It utilizes available gross head of about 589 m and envisages non-consumptive utilization of 11.0 Mm3 (0.39 TMC) of water by recirculation between upper and lower reservoirs on a weekly basis.

The capital cost of the project is Rs. 4766 Crores at 2020-21 price level including Interest During Construction (IDC) of Rs. 538 Crores. The project is expected to be operational within a period of five (5) years from the date of award of civil works package.

Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top