Project Detail:
The company has Proposed Nayagaon & Chenpura Limestone Deposit (ML Area: 206.354 ha) with the Production Capacity of 2.502 Million TPA ROM (Cement Grade Limestone: 0.876 Million TPA & Sub grade Limestone: 1.626 Million TPA), Soil/Alluvium: 0.048 Million TPA, Waste: 0.5 Million TPA; Total Excavation: 3.05 Million TPA along with 2 x 500 TPH Capacity of Crusher with Screening.
Estimated Cost of the Project Rs. 133.40 Crores
Note: Please Download Project Document attached to this Project for more information.
|