Project detail:
M/s Bharat Oorja Distilleries Pvt. Ltd. proposes to set up an standalone Greenfield 150 KLPD (Ethanol) Grain based Distillery along with 3.2 MW Power Generation and will be equipped with latest state of art technology “Multi Pressure Distillation” (MPR) and “Molecular Sieve Dehydration” (MSDH) for dehydration, to achieve good quality of Fuel grade Ethanol.
Bharat Oorja Distilleries Pvt. Ltd. (BODPL) has proposed to establish a Grain Based Distillery alongwith cogeneration plant Project at Industrial Park, Motipur Sugar Mill, Dist. Muzaffarpur in the State of Bihar, having Latitude 26°17'16.02"N & Longitude 85°4'40.05"E at elevation 54 m. The Project Site is connected to NH-28 through Motipur Sahebganj Road. It is about 35 kms. from district head quarter at Muzaffarpur. BODPL project site is about 10 Km. (NW) from Motipur Railway Station on Muzaffarpur-Raxaul Sec. of ECR.
M/s Bharat Oorja Distilleries Pvt. Ltd. proposed to set up an Greenfield Grain based distillery of 150 KLD capacity along with 3.2 MW Power plant with latest technology of Multi Pressure Distillation and MSDH for dehydration to achieve good quality of Fuel grade Ethanol.
Proposed production of 150 KLD distillery with 3.2 MW captive Power Generation plant will be based on grain such as Maize, Broken rice and the Spoiled Grain as basic raw materials. Other inputs will be water, antifoam agents, Urea, H2SO4 and enzymes. Rice husk/Biomass/Bagasse/Coal will be used as fuel in Boiler.
The Distillery proposes to achieve Zero Liquid Discharge by Decantation, Multi Effect Evaporation (MEE) followed by dryer to form Distiller’s Grain Solids with Solubles (DDGS), which will be used as cattle feed/fish. The entire spent wash will be used to achieve Zero Liquid Discharge.
The production capacity of ethanol in the country will be more than double of 710 crore litres contracted by the manufacuturers/sugar mills with oil marketing companies (OMCs) for ethanol blending programme (EBP) in 2019-20.
Total cost of the proposed BODPL project is estimated to be Rs. 176 Crores.
Note: please download project document attached to this project for more information.
|