Project Detail:
The proposed project is a Greenfield Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility. The estimated cost of the proposed project is ~ INR 50 Crores.
Total plot area is 64,750 sq.m, which include mainly 5,187 sq.m for Incineration Plant, 25,840 sq.m of TSDF development, 9,660 sq.m of roads, 2,236 sq.m of storm water drainage, 422 sq.m other open space & 21,405 sq.m greenbelt area; which is 33% of the total plot area.
The proposed project consist of:
1. Incineration Plant for disposal of incinerable hazardous waste.
2. Secured landfill site development for disposal of stabilized and landfillable wastes.
3. Infrastructure facilities for operation of the Incineration plant and Landfill cell.
4. Transport facilities in form of trucks for bringing materials to the site.
Note: Please Download Project Document attached to this Project for more information.
|