Subscription

Private SectorProject Information Proposed 14.5 MW Coal based Captive Co-generation Power Plant within the existing facility. INR 55 Cr INR 550 Mn
11-Jun-2021
PID : 46896 Tamil Nadu-India

Project Detail:

Sri Andal Paper Mill group is operating three numbers of waste paper based kraft paper mills at Puthupeerkadavu Village, Sathyamangalam in Coimbatore District under the name of Sri Andal Paper Mills Pvt. Limited with 60 TPD capacity, Sri Andal Paper Mills Unit II Pvt Limited with a capacity of 200 TPD and Sri Andal Paper and Board Pvt Limited with capacity of 60 TPD. All these facilities are located contiguous to each other. These paper mills complex is supported by common facilities such as administrative block, water supply system and power distribution.

The management of M/s. Sri Andal Paper Mills Private Limited with 60 TPD capacity (hereafter referred to SAPML/Existing facility) proposes installation of a 14.5 MW coal based captive cogeneration power plant within the premises of Sri Andal Paper Mill complex bearing the plot numbers of 533/1,534/4,540/8 and 541/1 to meet the power demand of all the three facilities within the complex and also to export any excess power to the state electricity grid.

proposed project involves the installation of a coal based Captive Co-generation Power Plant of capacity 14.5 MW. The existing kraft paper manufacturing facility of SAPML has been operating depending on the power supply from the grid. To become less dependent on the grid supply, SAPML has proposed to install an onsite coal-based captive power plant of 14.5 MW to meet the power demand in the kraft paper mill complex. Imported coal will be used for the proposed power plant

Land: Land requirement for the proposed 1 x 14.5 MW Captive Co-generation power plant project including associated facilities will be around 12 acres (4.86 ha) which will be housed within the vacant land available as part of the existing 60 TPD paper mill. No additional land will be acquired and hence displacement and rehabilitation of people are not envisaged.

Steam and Fuel: The proposed project involves the generation of 14.5 MW power from the captive co-generation power plant. The steam generation from the boiler is designed for 100% MCR (maximum continuous rating) flow of 100 TPH at 105 kg/cm2 and 535+5oC while firing imported coal. The steam capacity of 85 TPH will be supplied for power generation of 14.5 MW and the remaining 15 TPH steam will be supplied to the Kraft paper manufacturing facility.

The total cost of the project is about Rs. 55 Crores. Out of total cost, about Rs. 7 Crores is allocated for environmental management and pollution control. Recurring EMP cost of Rs. 6 Lakhs is projected for the proposed project.

Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top