Project Detail:
The company has proposed Panari Standalone PSP Project envisages construction of Panari upper reservoir and lower reservoir and the the required quantum of water for power generation will get stored in the reservoir through seasonal flow of water in the tributary /nala whenever it is available. Two alternative layouts for this scheme were studied.
Alternative – 1: Layout with Surface Powerhouse and other components of this scheme are Upper reservoir, Intake structure, Penstock / Pressure Shaft, Tail Race Tunnel, Tail Race Outlet and Lower reservoir.
Alternative -2: Layout with underground Powerhouse and other components of this scheme are Upper reservoir, Intake structure, Penstock / Pressure Shaft, Tail Race Tunnel, Tail Race Outlet and Lower reservoir.
Total cost of the Project: 8472.01 Cr.