Subscription

Private SectorProject Information Panari Standalone Pumped Storage Project (1800 MW). INR 8472.01 Cr INR 84.72 Bn
04-May-2020
PID : 33252 Madhya Pradesh-India

Project Detail:

The company has proposed Panari Standalone PSP Project envisages construction of Panari upper reservoir and lower reservoir and the the required quantum of water for power generation will get stored in the reservoir through seasonal flow of water in the tributary /nala whenever it is available. Two alternative layouts for this scheme were studied.
Alternative – 1: Layout with Surface Powerhouse and other components of this scheme are Upper reservoir, Intake structure, Penstock / Pressure Shaft, Tail Race Tunnel, Tail Race Outlet and Lower reservoir.
Alternative -2: Layout with underground Powerhouse and other components of this scheme are Upper reservoir, Intake structure, Penstock / Pressure Shaft, Tail Race Tunnel, Tail Race Outlet and Lower reservoir.
Total cost of the Project: 8472.01 Cr.

Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top