State GovernmentProject Information Bandu Pumped Storage Project. Refer Document
26-Sep-2019
PID : 27098 West Bengal-India

Project Detail:

The Scheme envisages construction of:
1) A 71 metre high Rockfill upper dam with central impervious clay core across river Bandu to provide a live storage of 13.49 million cum with Full Reservoir Level at 480.00 metre and Minimum draw down Level at 460.83 metre. Poundage for 1 MCM Irrigation requirement is also proposed in Upper Reservoir. The MDDL for Irrigation depletion is EL 458.75m.
2) A 53 metre high Rockfill lower dam with central impervious clay core across river Bandu to provide a live storage of 13.49 million cum with Full Reservoir Level at 340.44 metre and Minimum Draw down Level at 325.00 metre.
3) An underground power house with four numbers Francis type reversible pump-turbine of capacity 225/255 MW.
4) An underground Transformer cavern with four numbers Power Transformer of capacity 280 MVA.
5) One 400 kV Gas insulated Switchgear.
6) 1687 metre long headrace, Pressure Shaft, draft tube and tailrace tunnel for conveyance of water.

The estimated cost of the Bandu nala Pumped Storage Scheme for option-I and Option-II is Rs. 3809.88 Crore and 4168.82 Crore respectively and the annual energy generation will be of 1642.5 GWh. The project is scheduled to be completed by a period of 5 years 3months.

Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top