|
Project Details :
As discussed in the water supply section in the previous chapters, the key challenges are system losses due to old distribution network and uneven water supply distribution across the city. 100% coverage of water supply network is observed w.r.t the existing roads within the CCP area though only 79% of the total household have access to metered household connections. There is a lack of proper mechanism in place for monitoring and evaluation of water losses which accounts results in high NRW to of 35% at present. The gap analysis presents the current deficit in the system and future requirement for the design year 2041.
Note : For Further Information Please Download the Attachment.
|