State GovernmentProject Information Introduction of Battery Operated Electric Ferry between Kolkata and Howrah. INR 15 Cr INR 150 Mn
29-Jun-2019
PID : 25298 West Bengal-India

Project Detail:

The Government of West Bengal wishes to introduce two Battery Operated Electric-Ferries between Howrah and Kolkata on pilot basis. These 2 ferries will replace two diesel ferries from the current fleet and will also serve as a model for subsequent scale-up of adoption of electric ferries in Kolkata.
Charging infrastructure will be available at the destination points as noted below. Approximately 12-15 mins will be required to charge the battery of the boat
The charging stations will be connected to the main electricity grid through DC Charges
The Power level of the charging stations will be DC Level 3 (DCFC) with Grid Voltage/Current (in Amperes) Input of 400-800/≥120 Ampere for charging battery above 50 kW for ferries which are categorized as heavy duty vehicles.

Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top