State GovernmentProject Information
Introduction of Battery Operated Electric Ferry between Kolkata and Howrah.
|
INR 15 Cr
INR 150 Mn
|
29-Jun-2019
|
PID : 25298
West Bengal-India
|
Project Detail:
The Government of West Bengal wishes to introduce two Battery Operated Electric-Ferries between Howrah and Kolkata on pilot basis. These 2 ferries will replace two diesel ferries from the current fleet and will also serve as a model for subsequent scale-up of adoption of electric ferries in Kolkata.
Charging infrastructure will be available at the destination points as noted below. Approximately 12-15 mins will be required to charge the battery of the boat
The charging stations will be connected to the main electricity grid through DC Charges
The Power level of the charging stations will be DC Level 3 (DCFC) with Grid Voltage/Current (in Amperes) Input of 400-800/≥120 Ampere for charging battery above 50 kW for ferries which are categorized as heavy duty vehicles.
Note: Please Download Project Document attached to this Project for more information.
|
|
Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.