Project Detail:
Investment is possible in Electric trolley fleet, rechargeable battery manufacturing, vehicular technology, vehicle testing facility and charging infrastructure.
The buses will run on direct charge using the overhead 550 V DC network which will be upgraded to run the trolley buses
The buses will be equipped with smaller battery units enabling the bus to run without direct power for 5-6 kms
The overhead power infrastructure can be owned and operated by the WBTC/CTC or CESC in Kolkata and WBSEDCL outside Kolkata
Note: Please Download Project Document attached to this Project for more information.
|