Project Detail :
The Company Has Proposed To envisages the redevelopment of Berths 8th, 9th and barge berth at Mormugao Port. The main activities include construction of berths, construction of Bund, reclamation in an area of about 11.4 ha, capital dredging of 2.44 Mm3 for deepening of turning circle from 14.40 up to -19.50 m near the Berth face up to 50 m distance. The existing capacity of berth 8th and 9th is 13 MMTPA which will increase to 19.20 MMTPA, with the redevelopment of 3 berths. The entire facility lies within existing port area. The existing structures will be modified and redeveloped for the proposed development. The prosed facility envisages handling a variety of cargo including iron ore, bauxite, limestone, gypsum, steel products, granite, wood chips, coal, containers etc. Coal will be handled in totally covered conditions including covered storage and conveying system.
Note : Please Download Project Document Attached With This Project For More Information.
|