The company has proposed establish Common Effluent Treatment Plant (CETP) with 40 MLD capacity (2 Batteries of 20 MLD each) at Dahej Industrial estate, PCPIR including design, construction, erection, testing and commissioning as well as operation and maintenance. Total plot area for the proposed CETP is 549730 sq m. Total project cost will be Rs 256 Crores. Proposed project will be designed for effluent generated from the industries located in GIDC. Total water consumption for the proposed project will be 142 KL/day. Effluent generation from the proposed CETP will be 7.5 KL/day. Common Effluent Treatment will consist of Primary treatment, Biological Treatment and Tertiary Treatment Facility. Unit has proposed treatment system for removal of Ammonical Nitrogen and Fenton’s Reagent for removal of refractory COD. Treated effluent from the CETP will be pumped to existing Dahej final pumping station where the effluent from Vilayat, SEZ-I, SEZ-II, BASF, Dipak Nitrite, NOCIL, GFL etc. are mixed and finally pumped into Arabian Sea through 90 MLD capacity submarine pipeline with diffuser approx. 5 km in Sea. CETP will be designed to meet the outlet norms for discharge in Marine/Coastal area. Unit has proposed safety hood with alkali scrubber as APCM to control Chlorine gas emission likely to be emitted from Chlorine tonner in case of leakages. Unit has proposed 5 no.s of D.G. sets (capacity: 2500 KVA each) will be installed to curb with emergency situation. Diesel @ 2.5 KL/hr shall be required as a fuel for DG set. Hazardous wastes to be generated are ETP sludge (3600 MT/Month), Used Oil (1000 ltrs/Month) and Discarded containers (8 MT/Month).
Note: Please Download Project Document attached to this Project for more information.
|