Project detail :
The company has Proposed to New National highway -NH-160D. (Feeder Route of Bharatmala Project Route starts from Junction of NH-60). The total length of the alignment sums up to 48.7 km. There are two bypasses proposed along the alignment, at village Loni and Talegaon Dighe.The bypass alignments run through the side with minimum habitation to keep the bypass length optimum. At some places the alignment passes straight through some of the areas so as to meet the design speed, hence the curvature is avoided.
Note : Please Download Project Document attached with this Project for more information.
|