Project Details:-
The proposed Chanju-III HEP is being conceived as a run of river type development in Churah Sub-Division of Chamba district in Himachal Pradesh. The project envisages utilization of the combined waters of Chanju nallah a Left Bank tributary of Baira river and Mahed nallah, a left bank tributary of chanju nallah for Power generation. The scheme involves construction of a trench type diversion weir across Chanju nallah near Dantoi village and Power house just up-stream of the Mahed nallah with Chanju nallah near Jakhla village. A water conductor system comprising of feeder channel/tunnel, two underground desilting tank, Head race tunnel, underground forebay tank, pressure shaft and an underground power house. It is proposed to construct a Trench Weir across Mahed nallah and the diverted water shall be led to desilting tank, which shall be designed to include all silt particles down to +0.20mm and from there the water shall be feed through connecting tunnel to head race tunnel from Chanju nallah. Power house is located on the left bank of Chanju nallah just upstream of confluence of Mahed nallah & Chanju nallah shall house three units of 16 MW each. Power house shall have three generating units of 16000KW each along with auxiliary facilities such as cooling water/potable water supply system, fire fighting system, compressed air supply, oil system, ventilation and air conditioning system.
Note : Please Download Project Document attached with this Project for more information.
|