Project Details :-
The main objective of MIDC is to set up industrial areas for planned and systematic industrial development. Accordingly MIDC is developed at Nagpur (Butibori industrial area) which is located 25 km. The total area of existing Butibori MIDC is 2428.14 hectares which covers 16 villages having 2500 + industrial plots have been carved out, out of which 2000+ industrial plots have been allotted. To encourage the entrepreneurs, MIDC has constructed 46 work sheds. This industrial estate comprising IT Park, Apparel Park, and Food Park are developed in the area, remaining area is allotted for other categories of Industries. MIDC has developed CHW TSDF site for collection and disposal of hazardous waste in an area of 29.7 ha with design capacity to accept 60,000 tons per annum for 20 years. At present only 10,000 tons per annum waste is received. The CETP of 5 MLD capacity is also existing in 5 ha of land.The proposed additional Butibori Industrial area is located at 6 km from the existing MIDC, in 1391.85 ha of land nearly 36 km from Nagpur and 0.5 km from NH and SH.
Note: Please Download Project Document attached with this Project for more Information.
|