Project Details :
Unit proposes to start various types of pigments manufacturing unit at survey No. 409, 549, 551, 560, 562, 563, 564, 565, 566, 567, 571, Village: Piludara, Taluka: Jambusar, Dist.: Bharuch.
Above activities falls under 5(f) category - Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and chemical intermediates) and therefore prior EC is required.
The environmental monitoring will be scheduled on regular interval to assess the conditions. The record of these monitoring will be compared with the baseline study to know the changes in environmental conditions. The post-project environmental monitoring suggested herewith should be as per the following guideline. The highlights of the integrated environmental monitoring plan are:
* The stack monitoring facilities like ladder, platform and porthole at all the stacks will be maintained in good condition.
* Regular monitoring of all gaseous emissions from stacks/vents.
* The performance of air pollution control equipment evaluated based on these monitoring results.
* Water consumption will be recorded daily.
* As far as possible, noise curbed at its source, with the help of acoustic hoods and other such noise reducing equipment. Regular noise level monitoring will be carried out.