Filter

Projects for "Iron"

Filter
Description Value Updated Date
1. Power Plant, Iron, Civil Works Projects Expansion of Steel Plant, Existing Sponge Iron & Power Plant by Installation of 1x350 TPD DRI kiln to Produce 90,000 TPA to 1,95,000 TPA of Sponge Iron with 6.0 MW to 14 MW WHRB Facility, 6.0 MW to 8.0 MW AFBC Power Plant, New Induction Furnaces of 4x30 T to produce 4,18,630 TPA of Billets & New Narrow Hot Strip Mill to produce H.R. Coils, Strips of 4,00,000 TPA. INR 400 Cr INR 4 Bn
02-Jan-2024
PID : 65709 Karnataka Project
2. Iron, Boiler and Heater, Other Electrical Products, Power Plant Projects Expansion of Proposed Iron Ore Pelletization Plant from 0.6 MTPA to 1.2 MTPA and 1.0 MTPA Iron Beneficiation Plant located at village - Anra, Tehsil – Telkoi. INR 286 Cr INR 2.86 Bn
29-Dec-2023
PID : 65703 Orissa (Odisha) Project
3. Boiler and Heater, Other Machinery, Iron, Power Plant Projects Installation of Additional 12 Mt Induction Furnace to Produce 36,000 Tpa Ms Billets, Activity Covered Under 3 (A) Metallurgical Industries. Existing Production Capacity Sponge Iron: 2 X 100 Tpd – 60,000 Tpa, Whrb – 2 X 3 Mw, Induction Furnace 12 Mt – 36,000 Tpa Ms Billets And Biomass Based Power Plant – 5 mw. INR 1.80 Cr INR 18.09 Mn
26-Dec-2023
PID : 65697 Chhattisgarh Project
4. Other Machinery, Iron, Civil Works Projects Expansion of Its Existing Facility by Installing an Additional Electric Induction Furnace of 1 X 15 Tph In Addition To Existing 1 X 15 Tph Electric induction Furnace, and Expansion of the Rolling Mill By Increasing Number of Strands By 10- Additional Nos to Produce Billets and Tmt Bars. M.S. Scrap Along With Sponge Iron Will Be Melted In Electric Induction Furnace, The Molten Metal Is Cast Into Billets, And The Billets Are... INR 14 Cr INR 140 Mn
12-Dec-2023
PID : 65673 Andhra Pradesh Project
5. Boiler and Heater, Other Machinery, Iron Projects Establishment of 1 x 9 MVA Ferro Alloys Plant (Silicon Manganese – 14400 TPA or Ferro Manganese - 25200 TPA or Ferro Chrome -15000 TPA or Ferro Silicon – 7000 TPA or Pig Iron – 25200 TPA) in Existing 7.5 MW Biomass Based Power Plant Premises (Forward Integration) in Existing Plant Premises]. INR 13 Cr INR 130 Mn
17-Nov-2023
PID : 65633 Chhattisgarh Project
6. Iron, Minerals, Mining Equipments, Other Machinery Projects Proposed Expansion of Production of Iron Ore from 12 MTPA to 19.5 MTPA (Rom) with Total Excavation of 22.94 MTPA, and Beneficiation Plant Throughput Capacity Increase From 12 MTPA to 17.6 MTPA in Joda East Iron Ore Mine within Ml Area of 671.093 Ha Located In The Villages Joda, Kamarjoda, Banspani, Khuntpani & Baitarani Reserve Forest (R.F) In Barbil Taluka. INR 1915 Cr INR 19.15 Bn
07-Nov-2023
PID : 65621 Orissa (Odisha) Project
7. Minerals, Iron, Stainless Steel Projects Guali Iron Ore Mine Total Excavation of 37.67 million TPA [Saleable Iron Ore-27.44 MTPA, Mineral Rejects-2.56 MTPA, Waste-7.48 MTPA, Topsoil-0.184 MTPA] along with 1x5000 TPH, 1x2500 TPH Stationary Multistage Crushing & Screening Plant in addition to existing 1x175 TPH, 1x200 TPH, 2x400 TPH Stationary Crusher plant, 1X150 TPH Mobile Crusher Plant, 1x150 TPH, 5x250 TPH Mobile Screening Plant and 1x1500 TPH Stationary Screening... INR 1020.63 Cr INR 10.20 Bn
30-Oct-2023
PID : 65607 Orissa (Odisha) Project
8. Stainless Steel, Other Machinery, Iron, Safety Equipment\Explosives Projects Proposed 3.2 MTPA Pellet and 3.6 MTPA Pellet Feed Cum Beneficiation Plant at Somalapura Village, Sandur, at Somalapura Village (Survey nos. 97 to 109, 111, 113, 116 to 129 132, 134 to 138, 142 to 149, 154, 156 to 164, 166 to 168, 188 to 195, 197 to 204), Sandur Taluk. INR 2000 Cr INR 20 Bn
13-Oct-2023
PID : 65582 Karnataka Project
9. Iron, Stainless Steel Projects Expansion of HSD Steel Bar, Angle, Channel {Category a (Due to Presence of Nahargarh Wildlife Sanctuary at A Distance of 0.5km and Eco Sensitive Zone Boundary at A Distance of 0.48 Km) under Item ‘3(A)’-Metallurgical Industries (Ferrous & Non-Ferrous) of Schedule of Eia Notification, 2006 And Its Subsequent Amendments}. INR 38 Cr INR 380 Mn
04-Oct-2023
PID : 65565 Rajasthan Project
10. Power Plant, Other Machinery, Iron Projects Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills (Hot Charging and Reheating), Captive Power Plant (Afbc+Whrb), Fly Ash Bricks Unit and New Sub - Merged Arc Furnaces at Village Parsada, Post: Sarora, Tehsil Tilda. INR 212.57 Cr INR 2.12 Bn
30-Sep-2023
PID : 65561 Chhattisgarh Project
  • Show
  • Projects
Description Value Updated Date
  • Show
  • Project Awards
Description Value Updated Date
  • Show
  • Project News
Description Date
  • Show
  • Exhibitions
  • Show
  • Vendors
Description Value Due Date
  • Show
  • Tenders
Top