Subscription

Private SectorProject Information Expansion in Existing Environmental Clearance Granted Capacity of Integrated Cement Plant - Clinker: 2.0 to 4.5 Million TPA, Cement: 4.0 to 6.0 Million TPA, Waste Heat Recovery Power Generation: 20 to 40 MW and installation of Captive Power Plant: 25 MW, DG Sets of 2000 KVA (1000/500/250/125 KVA) along with Railway Siding at Village: Gothra, Tehsil: Nawalgarh. INR 3407.10 Cr INR 34.07 Bn
25-Dec-2023
PID : 65695 Rajasthan-India

Project Detail:

ocation of the project site covering village, Taluka/Tehsil, District and State.

Site accessibility

Adigital toposheet in pdf or shape file compatible to google earth of the study area of radius of 10km and site location preferably on 1:50,000 scale. (including all eco-sensitive areas and environmentally sensitive places).

Latest High-resolution satellite image data having 1m-5m spatial resolution like quickbird, Ikonos, IRS P-6 pan sharpened etc., along with delineation of plant boundary co-ordinates. Area must include at least 100m all around the project location.

Environment settings of the site and its surrounding along with map.

A list of major industries with name, products and distance from plant site within study area (10km radius) and the location of the industries shall be depicted in the study area map. 

vii. In case if the project site is in vicinity of the water body, 50 meters from the edge of the water body towards the site shall be treated as no development/construction zone. If it’s near the wetland, Guidelines for implementing Wetlands (Conservation and Management) Rules, 2017 may be followed.

In case if the project site is in vicinity of the river, the industry shall not be located within the river flood plain corresponding to one in 25 years flood, as certified by concerned District Magistrate/Executive Engineer from State Water Resources Department (or) any other officer authorized by the State Government for this purpose as per the provisions contained in the MoEF&CC Office Memorandum dated 14/02/2022.

Type of land, land use of the project site.

Status of acquisition of land. If acquisition is not complete, stage of the acquisition process as per the MoEF&CC O.M. dated 7/10/2014 shall be furnished.

Engineering layout of the area with dimensions depicting existing unit as well as proposed unit indicating storage area, plant area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout of Industrial Area indicating location of unit within the Industrial area/Estate.

Total Project Cost: Cr. 3407.1

Note: Please Download Project Document attached to this Project for more information.

Subscribe our annual Project Alert Service and get access to all similar Projects.If you are registered member, please fill in the subscription form below . If not, please Register first.

(*) Mandatory fields
Select Plan Unit Rate Subscription Validity
Rs. 25000 /- 1 Year
Rs. 40000 /- 1 Year
Rs. 60000 /- 1 Year
Rs. 50000 /- 1 Year
Rs. 75000 /- 1 Year
Rs. 125000 /- 1 Year
* Service Tax As Applicable

Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Ltd. to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.

Top