Project Detail:
Power requirement will be 1.5 MW, which will be met from the existing 15 MW cogeneration power plant. 40 TPH Spentwash & Coal fired incineration boiler will be installed. APCE ESP with a stack of height of 80 M will be installed for controlling the particulate emissions within the statutory limit of 30 mg/Nm 3 for the proposed boiler. Existing sugar & cogen has 85 TPH Bagasse fired boiler. APCE ESP with stack of height of 75 M is installed for controlling the particulate emissions within the statutory limit of 50 mg/Nm 3 . Industry has 2 nos. of DG sets with capacity 1350 KVA & 380 KVA which are used as standby during power failure and stack height 30 M & 6 M (ARL) is provided as per CPCB norms. No new DG set will be installed under proposed project.
Total Project Cost: Cr. 80
Note: Please Download Project Document attached to this Project for more information.
|