Project Detail:
The project envisages installation of 6 units of 115 MW each out of which 4 units are already installed and commissioned 45 years ago. Works for other two units were completed partially i.e. draft tubes are erected and concreting done up to EL 70 m. Lower Sileru hydropower project was envisaged to utilize the potential energy due to drop Sin the water level between Donkarayi and Polluru; which is 193.6 m and th quantum of available water is 13.25 TMC. Following are the major project components of existing project.