Project Detail:
The proposed project falls under 7 (e) Ports, Harbour, Cat –A (≥ 5 million TPA of cargo handling capacity, excluding fishing harbours) as per EIA notification 2006, and its subsequent amendments. Total investment/cost of the project is Rs 11,464.00 Crores comprising of 5,155.73Cr for Phase I and 6,308.16 Cr for Phase II.
Terrain and Topography: The terrain of the project area is shallow in nature and as per the National Hydrographic Charts beach slope of the project area lies in between 1:800 to 1:1000. The Machilipatnam bay, which measures approximately 6 km along north-south and 0.9 km along east-west, is bordered by Manginapudi village on the north and on the south the beach is backed by low lying land which is prone to flooding and towards the eastern boundary the ground level varies from 0.8 m to 1.0 m, and towards the western boundary of the port location the ground levels are higher than 2.0 m, with respect to MSL. However, in the creek, the ground levels are in the range of 0.5 m to (-) 2.0 m.
Total project is Rs 11,464.00 Crores
Note: Please Download Project Document attached to this Project for more information.
|